Reducing falls from vehicles – Case study WPT17

Case study WPT17 is now available on the HSE website. PCE Limited and Kier Build – safely unloading pre cast sections at new prison site.

The case study is part of a series, the example shows how a purpose built unloading system, a well trained workforce and good risk management are reducing the possibility of falls from vehicles during the unloading of large pre cast concrete sections.

Case study WPT17 – PCE Limited and Kier Build – safely unloading pre cast sections at new prison site.

Original post by HSE and many thanks to them for allowing “I want CHAS” to use and their entry about Health & Safety