Case study WPT17 is now available on the HSE website. PCE Limited and Kier Build – safely unloading pre cast sections at new prison site.
The case study is part of a series, the example shows how a purpose built unloading system, a well trained workforce and good risk management are reducing the possibility of falls from vehicles during the unloading of large pre cast concrete sections.