On Sunday 25 March a gas condensate release occurred on the Total Elgin wellhead platform. No injuries occurred but by early Monday morning all personnel aboard Elgin and on the adjacent Rowan Viking jack-up drilling rig were evacuated. At the time of down manning all wells were shut in and power isolated on both the Elgin platform and Rowan Viking.
Original post by HSE and many thanks to them for allowing “I want CHAS” to use and their entry about Health & Safety


