London 2012 – vehicles case study

Preventing falls during off-loading of vehicles. Background, a multi storey car park was constructed on the Olympic Park. The structure involved the delivery, unloading and placing of hundreds of items of steelwork and precast concrete floor slabs by tower crane.

Original post by HSE and many thanks to them for allowing “I want CHAS” to use and their entry about Health & Safety