London 2012 case studies – Three risks reduced by simple drilling jig

The Olympic Stadium contains 80,000 seats secured by four bolts to the concrete terrace. This work involved a lengthy and repeatable process of drilling into the concrete. The task presented risk from three important hazards: hand-arm vibration, exposure to noise, manual handling.

Original post by HSE and many thanks to them for allowing “I want CHAS” to use and their entry about Health & Safety